Sign In

Foundation Repair using Steel Pressed Pilings

in Foundation Repairs

Last updated 5 years ago

Foundation Repair with Steel Pressed Pilings

The Steel Pressed Pilings can be used in any area where the concrete pressed pilings can be used. They are also the preferred method in areas where the soil is more sandy or where there are thin stringers of harder strata between clay layers. These stringers may cause a “false refusal point” for a concrete piling. The steel piling can penetrate through these shallow stringers.

Time Required to do Repair: As with the pressed concrete pilings, the average steel piling installation can be completed in one day.

How the Pilings are Installed: The installation process is the same as the processed concrete piling except instead of a concrete cylinder, Structured Foundations Repairs, Inc. will press one foot sections of 2 7/8 O.D. Steel Pipe.

Warranty: Structured Foundation Repairs, Inc. offers a lifetime transferable warranty on the pressed steel pilings. It is our intention to permanently stabilize the settlement of the portion of the foundation where piers are installed.

 

  • Loading comments... Spinner

Free Plumbing Test $150 Value!

With the purchase of 8 pier minimum in foundation repairs. Mention this offer in the email submission form.



  • Hours:

  • 8:00 AM to 5:00 PM Monday
  • 8:00 AM to 5:00 PM Tuesday
  • 8:00 AM to 5:00 PM Wednesday
  • 8:00 AM to 5:00 PM Thursday
  • 8:00 AM to 5:00 PM Friday


Links

  • Recent Posts
    • Loading posts... Spinner
  • View All
  • Recent Comments
    • Loading comments... Spinner
  • Related Links
  • Popular Tags
    • Loading tags... Spinner